Released in English version.

Pyeongchang Winter Olympics Stadium, South Korea, built by DaeLim Construction

Top 4 in Top 10 sân vận động kiến trúc và sân thể thao của Dezeen.

by Autumn 05-05-2020

Opening of the 2018 Winter Olympics

The stadium accommodates 35,000 seats, and was built by DaeLim Construction. After the tournament, the stands are being removed leaving a sustainable structure, which will be built into a museum celebrating the Winter Olympics.

The stadium has a Pentagon shape, which symbolizes the five objectives of the Pyeongchang Winter Olympics: Economics, Environment, information technology, art and peace. Besides the stadium, the & ICT Cultural Gallery and the Medal Plaza are built as temporary buildings at Pyeongchang Olympic Plaza.

The 2-storey & ICT cultural gallery will feature artworks by South June Paik Media artists on the 1st floor and other contemporary artists such as Lee Jung Seob and Park Su-geun. On the second floor there are ICT areas where you can experience the advanced technology of the Olympic. Medal Plaza wide 1,267 square meters with a floor, will be used as the venue for the Olympic medal.

Tears in Heaven